In 2024, PT Bartim Coalindo is targeting further mine production with specific quantities and a growing number of hauling dump trucks (DTs). These details will be announced further down the line.
Size of reserves
PT Bartim Coalindo currently has measured reserves of 1,767,000 MT with an area of 120 Ha. The data is based on exploration data and will increase with further exploration.
In 2024 PT Bartim Coalindo has a coal production target of 475,000 MT, will continue in 2025 with a coal production target of 790,000 MT, and will increase in the following years.
PT Bartim Coalindo will prepare 10 fleets of heavy equipment, supporting
equipment and DT hauling units that will work in the mine area, including: